Feature:
(1) Advanced maximum power point tracking technology to optimize using the solar system.
(2) Peak conversion efficiency of 97 %, high Tracking efficiency of 99%.
(3) Very fast sweeping of the entire I-V curve, several seconds tracking speed.
(4) Widely used, automatic recognize day/night.
(5) Timer function with 1-15 hours option for street light.
(6) Unique dual timer function, enhance the flexibility of street light system.
(7) Sealed, Gel and Flooded battery option.
(8) Adopting temperature compensation and correcting the charging and discharging parameters automatically, improving the battery lifetime.
(9) Electronic protection: over charging, over discharging, overload, short circuit.
(10) Reverse protection: any combination of solar module and battery, without causing damage to any component.
(11) Excellent thermal design and nature air cooling.
Product configuration |
Specification: | ||
CP | 50A | |
charge mode | MPPT with constant current, constant voltage, floating | |
overall efficiency | 12V/24V/36V/48V 60V/72V96V optional | ≥99% |
Input characteristics | ||
MPPT working voltage range | 12V 24V system DC34V-DC150V 36V 48V system DC65V-DC150 48V 60V system DC65V-DC170V 72V96V system DC85V-DC180V | |
PV maximum open-circuit voltage input | 82V/82V/164V | |
The largest solar panels power input | 12V system(W) | 700W |
24V system(W) | 1400W | |
48V system(W) | 2800W | |
charge characteristic | ||
Battery types | 12V/24V/48V system | Sealed lead acid battery, discharge type pool, gel battery, nickel cadmium batteries ternary lithium battery lithium iron phosphate batteries (can also be customized for other kinds of battery) |
Rate current | 12V/24V/48V system | 50A |
Product size length * width * height | 276*241*100mm | |
N.W(kg) | 3 | |
50A and 60A developing stage |
Product |
Packing & Delivery |
Our Factory |
Packing & Delivery |
Certifications |
FAQ |
Q:Are you factory or trading company?
A:We have 3000 sqm modern factory.with 4 production lines.We have 40 factory workers and 5 of them are quality control and engineer guys.Welcome to visit our factory.
Q:How long is the lead time of orders?
A:Goods can be ready for shipment within 7-15 working days upon payment.If we have stock material.It only take 1-2days tu send goods.
Q:Can we get support if we have our owm market position?
A:Please inform us your details market demand we will discuss and propose helpful suggestion for you to find the best solution for you.
Q:Can I install it myself?
A:We provide installation drawing and user manual for you,guide the installation.If necessary,we can send our engineer come to country,and guide the installation.
Q:How to calculate the freight?
A:We will calculate according to the specific location and transportation method, you can discuss it in detail with us.